






Frames1980s Chevy Caprice frame
- Time
- ~1 day
- Media
- ~8 bags
- Media cost
- ~$190
Estimates for a job this size.
The problem
A frame is all corners: boxed rails, brackets, spring perches. A wire wheel canโt reach most of it, and rust left in a seam keeps spreading under new paint.
The setup
Body off, the frame up on stands or hung from a hoist. A pressure washer from 1,800 PSI up, the Bag Rig with the gravity bag hung from a beam.
How it ran
- Body off, frame up where you can reach underneath
- Rails first, one side at a time
- Crossmembers, brackets and spring perches
- Inside the channels with the ceramic nozzle
- Flush the sand out of every rail
The finish
Flushed, inhibitor then AP1, dried inside the channels, then chassis black the same day.



